CLARK RD over CHOCOLATE BAYOU
0.85 MI E OF CR 80 · County 039, Texas · Built 2011 · 2 Lanes · 280 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
29.460347, -95.383997
This bridge is in worse condition than 28.3% of bridges in County 039. The average bridge in Texas is 0 years old; this one is 15 years old.
Nearby Bridges
ALLELUIA TRAIL over E FORK CHOC BYU
Built 1985
MERIDIANA PKWY NB over BRISCOE CANAL
Built 2021
MERIDIANA PKWY SB over BRISCOE CANAL
Built 2021
CR 81 (STEVENS RD) over CHOCOLATE BAYOU
Built 2011
BISSELL RD over E FORK CHOC BYU
Built 2011
IOWA LN over BRAZOS RIV AUTH CANAL
Built 1988
CLARK RD over BRAZOS RIV AUTH CANAL
Built 1990
MERIDIANA PKWY NB over W FORK CHOCOLATE BAYOU
Built 2021
MERIDIANA PKWY SB over W FORK CHOCOLATE BAYOU
Built 2021
SH 6 over DRAINAGE DITCH
Built 1995
Bridge Details
- Structure #
- 120200W00215001
- Year Built
- 2011
- Length
- 21.3 m (69.9 ft)
- Max Span
- 12.2 m
- Width
- 8.1 m (26.6 ft)
- Lanes
- 2
- Daily Traffic
- 280
- Material
- Prestressed Concrete
- Design
- Other
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.