MERIDIANA PKWY NB over W FORK CHOCOLATE BAYOU
2.11 MI S OF SH 6 · County 039, Texas · Built 2021 · 2 Lanes · 200 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
29.446642, -95.382539
This bridge is in worse condition than 25.8% of bridges in County 039. The average bridge in Texas is 0 years old; this one is 5 years old.
Nearby Bridges
MERIDIANA PKWY SB over W FORK CHOCOLATE BAYOU
Built 2021
MASTERS ST over CHOCOLATE BAYOU
Built 2011
CLARK RD over CHOCOLATE BAYOU
Built 2011
MERIDIANA PKWY NB over BRISCOE CANAL
Built 2021
MERIDIANA PKWY SB over BRISCOE CANAL
Built 2021
MASTERS ST over DRAINAGE DITCH
Built 2015
CLARK RD over BRAZOS RIV AUTH CANAL
Built 1990
MERIDIANA PKWY WB over W FORK CHOCOLATE BAYOU
Built 2021
MERIDIANA PKWY EB over W FORK CHOCOLATE BAYOU
Built 2021
ALLELUIA TRAIL over E FORK CHOC BYU
Built 1985
Bridge Details
- Structure #
- 120200B00535301
- Year Built
- 2021
- Length
- 121.1 m (397.3 ft)
- Max Span
- 30.5 m
- Width
- 11.6 m (38.1 ft)
- Lanes
- 2
- Daily Traffic
- 200
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.