MERIDIANA PKWY WB over W FORK CHOCOLATE BAYOU
1.55 MI E OF SH 288 · County 039, Texas · Built 2021 · 2 Lanes · 200 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
29.438786, -95.406231
This bridge is in worse condition than 28.3% of bridges in County 039. The average bridge in Texas is 0 years old; this one is 5 years old.
Nearby Bridges
MERIDIANA PKWY EB over W FORK CHOCOLATE BAYOU
Built 2021
Iowa Colony Bld NB over Detention Basin
Built 2018
Iowa Colony Bld SB over Detention Basin
Built 2018
Meridiana Pkwy EB over Detention Basin
Built 2017
Meridiana Pkwy WB over Detention Basin
Built 2017
CR 48 over W FORK CHOC BYU
Built 1975
CR 64 over W FORK CHOC BYU
Built 2007
CR 64 over Drainage Ditch
Built 2023
CR 65 over DRAINAGE DITCH
Built 2004
SH 288 SB over OUTFALL CHANNEL
Built 1982
Bridge Details
- Structure #
- 120200U00873321
- Year Built
- 2021
- Length
- 131.1 m (430.1 ft)
- Max Span
- 29 m
- Width
- 11.3 m (37.1 ft)
- Lanes
- 2
- Daily Traffic
- 200
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.