CLAY AVEUNE over WACO CREEK

0.25 MI SW OF 11TH ST · County 309, Texas · Built 1930 · 2 Lanes · 3,834 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
091610B01011001
Year Built
1930
Length
9.1 m (29.9 ft)
Max Span
8.8 m
Width
23.2 m (76.1 ft)
Lanes
2
Daily Traffic
3,834
Material
Masonry
Design
Arch - Deck
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$167,000
Total Project Cost
$208,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.