US 77 over Bullhide Creek Relief
0.7 Mi S of FM 2643 · County 309, Texas · Built 1931 · 2 Lanes · 4,532 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
31.542819, -97.127453
This bridge is in worse condition than 90.8% of bridges in County 309. The average bridge in Texas is 0 years old; this one is 95 years old.
Nearby Bridges
IH 35 SBML over 11TH/12TH STREET
Built 2021
IH 35 over WACO CREEK
Built 2021
IH 35 NBML over 11TH/12TH STREET
Built 2022
12TH STREET NB over PRIMROSE CREEK
Built 1958
US 77 over Bullhide Creek
Built 1931
IH 35 over WATER EQUALIZER
Built 2022
IH 35 over WATER EQUALIZER
Built 2022
DUTTON AVEUNE over WACO CREEK
Built 1930
IH 35 over WATER EQUALIZER
Built 2022
10TH STREET over WACO CREEK
Built 1935
Bridge Details
- Structure #
- 091610020901010
- Year Built
- 1931
- Reconstructed
- 1958
- Length
- 48.8 m (160.1 ft)
- Max Span
- 7.9 m
- Width
- 13.8 m (45.3 ft)
- Lanes
- 2
- Daily Traffic
- 4,532
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $700,000
- Total Project Cost
- $1,100,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.