12TH STREET NB over PRIMROSE CREEK
0.15 MI SE OF LP 491 · County 309, Texas · Built 1958 · 1 Lanes · 1,549 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
31.542561, -97.127789
This bridge is in worse condition than 66% of bridges in County 309. The average bridge in Texas is 0 years old; this one is 68 years old.
Nearby Bridges
IH 35 SBML over 11TH/12TH STREET
Built 2021
IH 35 over WACO CREEK
Built 2021
US 77 over Bullhide Creek Relief
Built 1931
IH 35 NBML over 11TH/12TH STREET
Built 2022
US 77 over Bullhide Creek
Built 1931
IH 35 over WATER EQUALIZER
Built 2022
DUTTON AVEUNE over WACO CREEK
Built 1930
IH 35 over WATER EQUALIZER
Built 2022
IH 35 over WATER EQUALIZER
Built 2022
10TH STREET over WACO CREEK
Built 1935
Bridge Details
- Structure #
- 091610B06803001
- Year Built
- 1958
- Reconstructed
- 1971
- Length
- 18.9 m (62 ft)
- Max Span
- 4.6 m
- Width
- 8.6 m (28.2 ft)
- Lanes
- 1
- Daily Traffic
- 1,549
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $51,000
- Total Project Cost
- $113,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.