IH 35 over WATER EQUALIZER
0.41 MI S. OF S. 5TH ST. · County 309, Texas · Built 2022 · 8 Lanes · 101,223 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
31.543314, -97.127136
This bridge is in worse condition than 39.1% of bridges in County 309. The average bridge in Texas is 0 years old; this one is 4 years old.
Nearby Bridges
US 77 over Bullhide Creek
Built 1931
US 77 over Bullhide Creek Relief
Built 1931
IH 35 over WACO CREEK
Built 2021
IH 35 SBML over 11TH/12TH STREET
Built 2021
IH 35 NBML over 11TH/12TH STREET
Built 2022
IH 35 over WATER EQUALIZER
Built 2022
12TH STREET NB over PRIMROSE CREEK
Built 1958
IH 35 over WATER EQUALIZER
Built 2022
10TH STREET over WACO CREEK
Built 1935
IH 35 over WATER EQUALIZER
Built 2022
Bridge Details
- Structure #
- 091610001501792
- Year Built
- 2022
- Length
- 11.4 m (37.4 ft)
- Max Span
- 1.5 m
- Lanes
- 8
- Daily Traffic
- 101,223
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.