IDLEHURST LANE over RAPID CK
0.8SW CANYON LK DAM - RC · County 103, South Dakota · Built 1972 · 1 Lanes · 25 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
44.052939, -103.308994
This bridge is in worse condition than 94.3% of bridges in County 103. The average bridge in South Dakota is 0 years old; this one is 54 years old.
Nearby Bridges
SD044 over RAPID CK
Built 1967
SD044 over RAPID CK
Built 1967
COPPER HILL DRIVE over RED ROCK CANYON DRAINAGE
Built 2001
CHAPEL LANE over RAPID CK
Built 1974
SD044 over CLEGHORN CANYON
Built 1967
DARK CANYON ROAD over RAPID CK
Built 1972
DARK CANYON ROAD over RAPID CK
Built 1973
PARK DRIVE over RAPID CK
Built 1974
DARK CANYON ROAD over RAPID CK
Built 1972
DARK CANYON ROAD over RAPID CK
Built 1972
Bridge Details
- Structure #
- 000000052372320
- Year Built
- 1972
- Length
- 12.5 m (41 ft)
- Max Span
- 12.2 m
- Width
- 4.9 m (16.1 ft)
- Lanes
- 1
- Daily Traffic
- 25
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $110,000
- Total Project Cost
- $135,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.