CHAPEL LANE over RAPID CK
CHAPEL LANE & SD44 - RC · County 103, South Dakota · Built 1974 · 2 Lanes · 4,700 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
44.059692, -103.295011
This bridge is in worse condition than 94.3% of bridges in County 103. The average bridge in South Dakota is 0 years old; this one is 52 years old.
Nearby Bridges
SD044 over CLEGHORN CANYON
Built 1967
COPPER HILL DRIVE over RED ROCK CANYON DRAINAGE
Built 2001
PARK DRIVE over RAPID CK
Built 1974
IDLEHURST LANE over RAPID CK
Built 1972
SD044 over RAPID CK
Built 1967
SD044 over RAPID CK
Built 1967
SD044 over RAPID CK
Built 1962
TOMAHAWK DR over DRAINAGE CHANNEL
Built 1977
32ND STREET over RAPID CK
Built 1974
SHERIDAN LAKE ROAD over ARROWHEAD DRAIN
Built 1991
Bridge Details
- Structure #
- 000000052378315
- Year Built
- 1974
- Reconstructed
- 2006
- Length
- 55.5 m (182.1 ft)
- Max Span
- 36.6 m
- Width
- 12.5 m (41 ft)
- Lanes
- 2
- Daily Traffic
- 4,700
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $100,000
- Total Project Cost
- $140,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.