SD044 over CLEGHORN CANYON
3.6 SW JCT SD 231 · County 103, South Dakota · Built 1967 · 4 Lanes · 5,920 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
44.060111, -103.295153
This bridge is in worse condition than 44.3% of bridges in County 103. The average bridge in South Dakota is 0 years old; this one is 59 years old.
Nearby Bridges
CHAPEL LANE over RAPID CK
Built 1974
COPPER HILL DRIVE over RED ROCK CANYON DRAINAGE
Built 2001
PARK DRIVE over RAPID CK
Built 1974
IDLEHURST LANE over RAPID CK
Built 1972
SD044 over RAPID CK
Built 1967
SD044 over RAPID CK
Built 1967
SD044 over RAPID CK
Built 1962
TOMAHAWK DR over DRAINAGE CHANNEL
Built 1977
32ND STREET over RAPID CK
Built 1974
SHERIDAN LAKE ROAD over ARROWHEAD DRAIN
Built 1991
Bridge Details
- Structure #
- 000000052374318
- Year Built
- 1967
- Length
- 18.4 m (60.4 ft)
- Max Span
- 6.6 m
- Width
- 19.8 m (65 ft)
- Lanes
- 4
- Daily Traffic
- 5,920
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $30,000
- Total Project Cost
- $49,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.