DARK CANYON ROAD over RAPID CK
1.3W 0.9S FISH HATCH · County 103, South Dakota · Built 1972 · 2 Lanes · 262 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
44.044753, -103.326658
This bridge is in worse condition than 44.3% of bridges in County 103. The average bridge in South Dakota is 0 years old; this one is 54 years old.
Nearby Bridges
DARK CANYON ROAD over RAPID CK
Built 1973
DARK CANYON ROAD over RAPID CK
Built 1972
SD044 over RAPID CK
Built 1967
DARK CANYON ROAD over RAPID CK
Built 1972
SD044 over RAPID CK
Built 1967
IDLEHURST LANE over RAPID CK
Built 1972
COPPER HILL DRIVE over RED ROCK CANYON DRAINAGE
Built 2001
CHAPEL LANE over RAPID CK
Built 1974
SD044 over CLEGHORN CANYON
Built 1967
PARK DRIVE over RAPID CK
Built 1974
Bridge Details
- Structure #
- 000000052363326
- Year Built
- 1972
- Length
- 21.3 m (69.9 ft)
- Max Span
- 10.4 m
- Width
- 8.2 m (26.9 ft)
- Lanes
- 2
- Daily Traffic
- 262
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.