PR 103 over PIEDRA CREEK

2 KM N.E. CABO ROJO · County 023, Puerto Rico · Built 1999 · 2 Lanes · 5,000 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
E13561
Year Built
1999
Length
6.5 m (21.3 ft)
Max Span
1 m
Width
7.5 m (24.6 ft)
Lanes
2
Daily Traffic
5,000
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$190,000
Total Project Cost
$228,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.