PR-2 over PR-319

0.50 KM. S.E. HORMIGUEROS · County 067, Puerto Rico · Built 2008 · 4 Lanes · 45,100 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
028771
Year Built
2008
Length
251.3 m (824.5 ft)
Max Span
36.2 m
Width
28.4 m (93.2 ft)
Lanes
4
Daily Traffic
45,100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.