PR 114 10.1 KM over GUANAJIBO RIVER

6.5 KM N W OF SAN GERMAN · County 125, Puerto Rico · Built 1989 · 2 Lanes · 12,700 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
019361
Year Built
1989
Length
30.3 m (99.4 ft)
Max Span
15.2 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
12,700
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$70,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.