PR 103 6.3 KM over CHANNEL
2 KM N E OF CABO ROJO · County 023, Puerto Rico · Built 1910 · 2 Lanes · 5,000 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
3
Serious
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 3 | Serious |
Location
18.099222, -67.129683
This bridge is in worse condition than 95.5% of bridges in County 023. The average bridge in Puerto Rico is 0 years old; this one is 116 years old.
Nearby Bridges
PR 103 over PIEDRA CREEK
Built 1999
PR 103 4.5 KM over PIEDRA CREEK
Built 1999
PR 102 over PIEDRA CREEK
Built 1993
PR 103 over LAS TUNAS CREEK
Built 1983
PR 103 0.7 KM over VIEJO RIVER
Built 1842
PR 319 1.1 KM over ROSARIO RIVER
Built 2003
PR 114 10.1 KM over GUANAJIBO RIVER
Built 1989
PR 114 5.6 KM over GUANAJIBO RIVER
Built 1990
PR 114 12.1 KM over VIEJO RIVER
Built 1932
PR-2 over PR-319
Built 2008
Bridge Details
- Structure #
- 013811
- Year Built
- 1910
- Length
- 10.4 m (34.1 ft)
- Max Span
- 4.8 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 5,000
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $148,000
- Total Project Cost
- $278,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.