PR-834 over WATERWAY

4 KMS. SOUTH OF GUAYNABO · County 061, Puerto Rico · Built 2003 · 4 Lanes · 4,900 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
026631
Year Built
2003
Length
403.3 m (1323.2 ft)
Max Span
40 m
Width
25.9 m (85 ft)
Lanes
4
Daily Traffic
4,900
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$418,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.