PR.20 over PR.169 & GUAYNABO RI
4 KM SOUTH OF GUAYNABO · County 061, Puerto Rico · Built 2003 · 4 Lanes · 34,900 vehicles/day
Overall
Deck
5
Fair
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
18.329786, -66.099867
This bridge is in worse condition than 60.3% of bridges in County 061. The average bridge in Puerto Rico is 0 years old; this one is 23 years old.
Nearby Bridges
PR 20 over PR 1
Built 2000
PR 1 over GUAYNABO RIVER
Built 1955
Ramp over Waterway
Built 2011
PR-834 over WATERWAY
Built 2003
PR 836 0.1 KM over GUAYNABO RIVER
Built 1954
PR 836 1.1 KM over CAMARONES CREEK
Built 1961
PR 834 0.02 KM over GUAYNABO RIVER
Built 1945
PR-20 over LOCAL ROAD
Built 2000
PR 20 over LOCAL ROAD
Built 2000
PR 1 over GUAYNABO RIVER & PR
Built 1955
Bridge Details
- Structure #
- 026241
- Year Built
- 2003
- Length
- 169.9 m (557.4 ft)
- Max Span
- 34.5 m
- Width
- 25.4 m (83.3 ft)
- Lanes
- 4
- Daily Traffic
- 34,900
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.