PR 834 0.02 KM over GUAYNABO RIVER
4.9 KM S E OF GUAYNABO · County 061, Puerto Rico · Built 1945 · 2 Lanes · 4,900 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
4
Poor
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 4 | Poor |
| Substructure | 6 | Satisfactory |
Location
18.317433, -66.094739
This bridge is in worse condition than 92.1% of bridges in County 061. The average bridge in Puerto Rico is 0 years old; this one is 81 years old.
Nearby Bridges
PR 1 over GUAYNABO RIVER & PR
Built 1955
PR 173 over ARENAS CREEK
Built 1939
PR 173 over GUAYNABO RIVER
Built 1939
OFF PR 834 0.45 KM over FUTURE PR 20
Built 2000
PR-834 over WATERWAY
Built 2003
Ramp over Waterway
Built 2011
Off PR834 at 5.6Km over Unknown Creek
Built 2008
PR 1 over GUAYNABO RIVER
Built 1955
PR 20 over PR 1
Built 2000
PR.20 over PR.169 & GUAYNABO RI
Built 2003
Bridge Details
- Structure #
- 005531
- Year Built
- 1945
- Length
- 29.6 m (97.1 ft)
- Max Span
- 14.4 m
- Width
- 7 m (23 ft)
- Lanes
- 2
- Daily Traffic
- 4,900
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $463,000
- Total Project Cost
- $509,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.