PR 1 over GUAYNABO RIVER & PR
5 KM SOUTH OF GUAYNABO · County 061, Puerto Rico · Built 1955 · 4 Lanes · 40,100 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
18.316428, -66.095108
This bridge is in worse condition than 60.3% of bridges in County 061. The average bridge in Puerto Rico is 0 years old; this one is 71 years old.
Nearby Bridges
PR 834 0.02 KM over GUAYNABO RIVER
Built 1945
PR 173 over ARENAS CREEK
Built 1939
PR 173 over GUAYNABO RIVER
Built 1939
OFF PR 834 0.45 KM over FUTURE PR 20
Built 2000
Off PR834 at 5.6Km over Unknown Creek
Built 2008
PR-834 over WATERWAY
Built 2003
Ramp over Waterway
Built 2011
PR 1 over GUAYNABO RIVER
Built 1955
PR 20 over PR 1
Built 2000
LOCAL ROAD 0.40 KM over PR 834 22.9 KM
Built 2002
Bridge Details
- Structure #
- 006921
- Year Built
- 1955
- Length
- 79.5 m (260.8 ft)
- Max Span
- 22 m
- Width
- 20.3 m (66.6 ft)
- Lanes
- 4
- Daily Traffic
- 40,100
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $484,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.