OFF PR 182 11.2 KM over GUAYANES RIVER
0.2 KM SOUTH OF PR 182 · County 151, Puerto Rico · Built 1988 · 1 Lanes · 2,000 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
18.084986, -65.965189
This bridge is in worse condition than 78.6% of bridges in County 151. The average bridge in Puerto Rico is 0 years old; this one is 38 years old.
Nearby Bridges
OFF PR 182 14.2 KM over GUAYANES RIVER
Built 1973
OFF PR 182 12.2 KM over GUAYANES RIVER
Built 1997
PR-9920 Km.4.30 over Waterway Unname Creek
Built 2000
PR 9920 1.6 KM over ARENAS CREEK
Built 1971
PR 181 14.7 KM over SANCHEZ CREEK
Built 1940
PR 181 14.9 KM over PRIETO RIVER
Built 1940
OFF PR 902 4.4 KM over CAPELES CREEK
Built 1991
PR 181 12.0 KM over CAMPO AZUL CREEK
Built 1940
OFF PR 902 over TRIBUTARIO RIO CAYAGUAS
Built 2019
PR 181 16.8 KM over GRANDE DE LOIZA RIVER
Built 1940
Bridge Details
- Structure #
- 025801
- Year Built
- 1988
- Length
- 19.4 m (63.6 ft)
- Max Span
- 8.7 m
- Width
- 4.8 m (15.7 ft)
- Lanes
- 1
- Daily Traffic
- 2,000
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $122,000
- Total Project Cost
- $183,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.