PR 181 14.7 KM over SANCHEZ CREEK

12 KM NORTH OF PATILLAS · County 151, Puerto Rico · Built 1940 · 2 Lanes · 1,800 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
4
Poor

Bridge Details

Structure #
004121
Year Built
1940
Length
20.5 m (67.3 ft)
Max Span
6 m
Width
7.1 m (23.3 ft)
Lanes
2
Daily Traffic
1,800
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$265,000
Total Project Cost
$497,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.