PR 181 12.0 KM over CAMPO AZUL CREEK
12 KM WEST OF YABUCOA · County 151, Puerto Rico · Built 1940 · 2 Lanes · 6,300 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
18.068992, -65.994197
This bridge is in worse condition than 28.6% of bridges in County 151. The average bridge in Puerto Rico is 0 years old; this one is 86 years old.
Nearby Bridges
PR 181 12.6 KM over PRIETO RIVER
Built 1940
PR 181 14.7 KM over SANCHEZ CREEK
Built 1940
PR 181 14.9 KM over PRIETO RIVER
Built 1940
PR 181 16.8 KM over GRANDE DE LOIZA RIVER
Built 1940
PR 181 9.1 KM over DEPRESSION
Built 1940
OFF PR 182 12.2 KM over GUAYANES RIVER
Built 1997
OFF PR 182 14.2 KM over GUAYANES RIVER
Built 1973
PR 181 13.6 KM over GUAYABOTA CREEK
Built 1940
PR 181 6.05 KM over COQUI NO 2 CREEK
Built 1940
PR 181 4.4 KM over MARIN CREEK
Built 1938
Bridge Details
- Structure #
- 004091
- Year Built
- 1940
- Length
- 6.9 m (22.6 ft)
- Max Span
- 6.9 m
- Width
- 8.2 m (26.9 ft)
- Lanes
- 2
- Daily Traffic
- 6,300
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $110,000
- Total Project Cost
- $138,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.