PR 181 4.4 KM over MARIN CREEK
3 KM NORTH OF PATILLAS · County 109, Puerto Rico · Built 1938 · 2 Lanes · 600 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
18.038722, -65.996547
This bridge is in worse condition than 46.9% of bridges in County 109. The average bridge in Puerto Rico is 0 years old; this one is 88 years old.
Nearby Bridges
PR 181 6.0 KM over COQUI CREEK
Built 1940
PR 181 6.05 KM over COQUI NO 2 CREEK
Built 1940
PR 181 9.1 KM over DEPRESSION
Built 1940
PR 7759 0.3 KM over LOS BARROS RIVER
Built 1955
PR 757 4 KM over DEL APEADERO RIVER
Built 1950
OFF PR 757 @ K3.8 over DE APEADERO RIVER
Built 1981
PR 181 12.6 KM over PRIETO RIVER
Built 1940
OFF PR 759 8.9 KM over GRANDE DE MAUNABO RIVER
Built 1965
PR 181 12.0 KM over CAMPO AZUL CREEK
Built 1940
OFF PR 757 KM 3.05 over DE APEADERO RIVER
Built 1965
Bridge Details
- Structure #
- 004051
- Year Built
- 1938
- Length
- 19.1 m (62.7 ft)
- Max Span
- 6.5 m
- Width
- 7.1 m (23.3 ft)
- Lanes
- 2
- Daily Traffic
- 600
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $264,000
- Total Project Cost
- $397,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.