PR 757 4 KM over DEL APEADERO RIVER
5 KM N E OF PATILLAS · County 109, Puerto Rico · Built 1950 · 1 Lanes · 400 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Culvert
2
Critical
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 2 | Critical |
Location
18.020564, -65.982053
This bridge is in worse condition than 100% of bridges in County 109. The average bridge in Puerto Rico is 0 years old; this one is 76 years old.
Nearby Bridges
OFF PR 757 @ K3.8 over DE APEADERO RIVER
Built 1981
OFF PR 757 KM 3.05 over DE APEADERO RIVER
Built 1965
PR 181 6.0 KM over COQUI CREEK
Built 1940
PR 7757 over CHICO RIVER
Built 1954
PR 181 4.4 KM over MARIN CREEK
Built 1938
PR 181 6.05 KM over COQUI NO 2 CREEK
Built 1940
PR 7757 0.8 KM over CREEK
Built 1958
PR 7757 1.6 KM over LOS POLLOS CREEK
Built 1938
OFF PR 759 8.9 KM over GRANDE DE MAUNABO RIVER
Built 1965
Off PR 759 Km 7.9 over Maunabo River
Built 2015
Bridge Details
- Structure #
- 013251
- Year Built
- 1950
- Length
- 7 m (23 ft)
- Max Span
- 3.3 m
- Lanes
- 1
- Daily Traffic
- 400
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $624,000
- Total Project Cost
- $234,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.