PR 7757 0.8 KM over CREEK
2.5 KM EAST OF PATILLAS · County 109, Puerto Rico · Built 1958 · 2 Lanes · 200 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
18.001319, -65.994975
This bridge is in worse condition than 46.9% of bridges in County 109. The average bridge in Puerto Rico is 0 years old; this one is 68 years old.
Nearby Bridges
PR 7757 over CHICO RIVER
Built 1954
OFF PR 757 KM 3.05 over DE APEADERO RIVER
Built 1965
PR 7757 1.6 KM over LOS POLLOS CREEK
Built 1938
PR 3 123.8 KM over CHICO RIVER
Built 1951
PR 3R 0.5 KM over IRRIGATION CHANNEL
Built 1986
PR 53 over GRANDE DE PATILLAS RIVER
Built 1994
OFF PR 757 @ K3.8 over DE APEADERO RIVER
Built 1981
PR 181 34.1 KM over IRRIGATION CHANNEL
Built 2009
PR-3 over IRRIGATION CHANNEL
Built 2009
PR 757 4 KM over DEL APEADERO RIVER
Built 1950
Bridge Details
- Structure #
- 015491
- Year Built
- 1958
- Length
- 10.7 m (35.1 ft)
- Max Span
- 10.1 m
- Width
- 7.1 m (23.3 ft)
- Lanes
- 2
- Daily Traffic
- 200
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $148,000
- Total Project Cost
- $278,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.