PR 3 123.8 KM over CHICO RIVER
2 KM S E OF PATILLAS · County 109, Puerto Rico · Built 1951 · 2 Lanes · 8,300 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
17.986283, -66.004281
This bridge is in worse condition than 46.9% of bridges in County 109. The average bridge in Puerto Rico is 0 years old; this one is 75 years old.
Nearby Bridges
PR 53 over GRANDE DE PATILLAS RIVER
Built 1994
PR 7757 0.8 KM over CREEK
Built 1958
PR 7757 over CHICO RIVER
Built 1954
PR 3R 0.5 KM over IRRIGATION CHANNEL
Built 1986
PR 7757 1.6 KM over LOS POLLOS CREEK
Built 1938
PR-3 over IRRIGATION CHANNEL
Built 2009
PR 181 34.1 KM over IRRIGATION CHANNEL
Built 2009
PR 3 over GRANDE DE PATILLAS RIVER
Built 2003
PR 3 over YAUREL CREEK
Built 2003
OFF PR 757 KM 3.05 over DE APEADERO RIVER
Built 1965
Bridge Details
- Structure #
- 004251
- Year Built
- 1951
- Length
- 37.8 m (124 ft)
- Max Span
- 15 m
- Width
- 11.3 m (37.1 ft)
- Lanes
- 2
- Daily Traffic
- 8,300
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,230,000
- Total Project Cost
- $305,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.