PR 3 over YAUREL CREEK

4 KM. SW. OF PATILLAS · County 015, Puerto Rico · Built 2003 · 6 Lanes · 19,800 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
027111
Year Built
2003
Length
21.4 m (70.2 ft)
Max Span
4.1 m
Width
55.4 m (181.8 ft)
Lanes
6
Daily Traffic
19,800
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.