PR 3 over YAUREL CREEK
4 KM. SW. OF PATILLAS · County 015, Puerto Rico · Built 2003 · 6 Lanes · 19,800 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
17.982011, -66.03125
This bridge is in worse condition than 23.1% of bridges in County 015. The average bridge in Puerto Rico is 0 years old; this one is 23 years old.
Nearby Bridges
OFF PR 755 over IRRIGATION CHANNEL
Built 2014
OFF PR 7755 over JACABOA RIVER
Built 1982
PR 3 over GRANDE DE PATILLAS RIVER
Built 2003
PR 753 over IRRIGATION CHANNEL
Built 1948
PR 53 over GRANDE DE PATILLAS RIVER
Built 1994
PR 3R 0.5 KM over IRRIGATION CHANNEL
Built 1986
PR 3 123.8 KM over CHICO RIVER
Built 1951
PR-3 over IRRIGATION CHANNEL
Built 2009
PR 3 132.5 KM over NIGUA RIVER
Built 1981
PR 181 34.1 KM over IRRIGATION CHANNEL
Built 2009
Bridge Details
- Structure #
- 027111
- Year Built
- 2003
- Length
- 21.4 m (70.2 ft)
- Max Span
- 4.1 m
- Width
- 55.4 m (181.8 ft)
- Lanes
- 6
- Daily Traffic
- 19,800
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.