PR 181 13.6 KM over GUAYABOTA CREEK
1 KM S INT PR181 & PR · County 151, Puerto Rico · Built 1940 · 2 Lanes · 6,300 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
18.094928, -66.000769
This bridge is in worse condition than 45.2% of bridges in County 151. The average bridge in Puerto Rico is 0 years old; this one is 86 years old.
Nearby Bridges
PR 181 16.8 KM over GRANDE DE LOIZA RIVER
Built 1940
PR 181 18.7 KM over BERRACO CREEK
Built 1940
PR 181 17.9 KM over UNKNOWN CREEK
Built 1940
PR 181 over LAJAS CREEK
Built 1939
PR 181 14.9 KM over PRIETO RIVER
Built 1940
PR 181 14.7 KM over SANCHEZ CREEK
Built 1940
OFF PR 182 14.2 KM over GUAYANES RIVER
Built 1973
PR 9920 over GRANDE DE LOIZA RIVER
Built 1960
PR 181 12.0 KM over CAMPO AZUL CREEK
Built 1940
OFF PR 182 12.2 KM over GUAYANES RIVER
Built 1997
Bridge Details
- Structure #
- 004111
- Year Built
- 1940
- Length
- 27.3 m (89.6 ft)
- Max Span
- 10.9 m
- Width
- 7.6 m (24.9 ft)
- Lanes
- 2
- Daily Traffic
- 6,300
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $53,000
- Total Project Cost
- $64,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.