OFF PR 902 4.4 KM over CAPELES CREEK
4.5 KM OF INT PR181 & · County 129, Puerto Rico · Built 1991 · 1 Lanes · 150 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
18.110958, -65.952558
This bridge is in worse condition than 80.4% of bridges in County 129. The average bridge in Puerto Rico is 0 years old; this one is 35 years old.
Nearby Bridges
PR 902 5.5 KM over CAYAGUAS RIVER
Built 1965
OFF PR 902 over TRIBUTARIO RIO CAYAGUAS
Built 2019
PR 9920 1.6 KM over ARENAS CREEK
Built 1971
PR-9920 Km.4.30 over Waterway Unname Creek
Built 2000
OFF PR 182 11.2 KM over GUAYANES RIVER
Built 1988
OFF PR 182 14.2 KM over GUAYANES RIVER
Built 1973
PR 902 0.02 KM over GRANDE DE LOIZA RIVER
Built 1965
PR 9920 over GRANDE DE LOIZA RIVER
Built 1960
PR 9912 3.05 KM over CAYAGUAS RIVER
Built 1969
PR 916 KM 0.9 over ARENAS CREEK
Built 1961
Bridge Details
- Structure #
- 022441
- Year Built
- 1991
- Length
- 9.6 m (31.5 ft)
- Max Span
- 3.4 m
- Width
- 3.6 m (11.8 ft)
- Lanes
- 1
- Daily Traffic
- 150
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $35,000
- Total Project Cost
- $65,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.