PR 9936 0.2 KM over ARENAS CREEK
1 KM N W OF LAS PIEDRAS · County 085, Puerto Rico · Built 1960 · 2 Lanes · 3,400 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
18.199933, -65.865922
This bridge is in worse condition than 29.2% of bridges in County 085. The average bridge in Puerto Rico is 0 years old; this one is 66 years old.
Nearby Bridges
PR 936 over ARENAS CREEK
Built 1933
PR 204 0.99 KM over PR 30 19.8 KM
Built 1998
PR 30 WEBD 21.9 KM over PR 183 18.5 KM
Built 1965
PR 30 EABD 21.9 KM over PR 183 21.2 KM
Built 1965
PR 921 1.1 KM over HUMACAO RIVER
Built 1953
PR 9937 1.0 KM over PR 30 18.85 KM
Built 1967
PR 31 over GURABO RIVER
Built 1980
PR 30 WEBD 22.1 KM over HUMACAO RIVER
Built 1965
PR 30 ETBD 22.1 KM over HUMACAO RIVER
Built 1964
PR-204 0.7 KM over CEIBA NORTE CREEK
Built 2011
Bridge Details
- Structure #
- 013621
- Year Built
- 1960
- Length
- 8 m (26.2 ft)
- Max Span
- 3.6 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 2
- Daily Traffic
- 3,400
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $125,000
- Total Project Cost
- $156,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.