PR 31 over GURABO RIVER
5 KM NORTH OF LAS PIEDRAS · County 085, Puerto Rico · Built 1980 · 2 Lanes · 7,800 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
18.22805, -65.857925
This bridge is in worse condition than 50% of bridges in County 085. The average bridge in Puerto Rico is 0 years old; this one is 46 years old.
Nearby Bridges
PR 9936 over GURABO RIVER
Built 1998
PR 31 19.6 KM over PINERO CREEK
Built 1993
PR 31 16.2 KM over LOS RABANOS CREEK
Built 2004
OFF PR 948 2.1 KM over GURABO RIVER
Built 1976
PR 936 over ARENAS CREEK
Built 1933
PR 936 5.7 KM over BOQUERON CREEK
Built 2009
PR 948 5.4 KM over GURABO RIVER
Built 1966
PR 9936 0.2 KM over ARENAS CREEK
Built 1960
PR 31 23.0 KM over GURABO RIVER
Built 1928
PR 935 4.0 KM over LOS CHINOS CREEK
Built 1965
Bridge Details
- Structure #
- 016511
- Year Built
- 1980
- Length
- 24.4 m (80.1 ft)
- Max Span
- 11.9 m
- Width
- 15.1 m (49.5 ft)
- Lanes
- 2
- Daily Traffic
- 7,800
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $187,000
- Total Project Cost
- $227,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.