PR 31 16.2 KM over LOS RABANOS CREEK
8 KM EAST OF JUNCOS · County 085, Puerto Rico · Built 2004 · 2 Lanes · 7,800 vehicles/day
Overall
Deck
5
Fair
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
18.228503, -65.840136
This bridge is in worse condition than 50% of bridges in County 085. The average bridge in Puerto Rico is 0 years old; this one is 22 years old.
Nearby Bridges
PR 936 5.7 KM over BOQUERON CREEK
Built 2009
PR 31 over GURABO RIVER
Built 1980
OFF PR 948 2.1 KM over GURABO RIVER
Built 1976
PR 9936 over GURABO RIVER
Built 1998
PR 936 over ARENAS CREEK
Built 1933
PR 948 5.4 KM over GURABO RIVER
Built 1966
PR 31 19.6 KM over PINERO CREEK
Built 1993
PR 950 6.2 KM over SONADORA CREEK
Built 1960
OFF PR 924 over COLLORES CREEK
Built 1996
PR 9936 0.2 KM over ARENAS CREEK
Built 1960
Bridge Details
- Structure #
- 027211
- Year Built
- 2004
- Length
- 20.8 m (68.2 ft)
- Max Span
- 19.3 m
- Width
- 15.1 m (49.5 ft)
- Lanes
- 2
- Daily Traffic
- 7,800
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.