PR 30 EABD 21.9 KM over PR 183 21.2 KM

1.7 KM SW OF LAS PIEDRAS · County 085, Puerto Rico · Built 1965 · 2 Lanes · 37,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
009322
Year Built
1965
Length
51.8 m (169.9 ft)
Max Span
23.4 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
37,500
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.