PR 9937 1.0 KM over PR 30 18.85 KM

3 KM WNW OF LAS PIEDRAS · County 085, Puerto Rico · Built 1967 · 2 Lanes · 700 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
001441
Year Built
1967
Length
58.5 m (191.9 ft)
Max Span
17 m
Width
8.3 m (27.2 ft)
Lanes
2
Daily Traffic
700
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$947,000
Total Project Cost
$1,136,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.