PR 851 4.1 KM over INFIERNO CREEK
6 KM SOUTH TRUJILLO ALTO · County 139, Puerto Rico · Built 1965 · 1 Lanes · 2,100 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
18.311097, -66.002078
This bridge is in worse condition than 33.3% of bridges in County 139. The average bridge in Puerto Rico is 0 years old; this one is 61 years old.
Nearby Bridges
PR 175 over CARRAIZO CREEK
Built 1953
PR 176 11.05 KM over CARRAIZO CREEK
Built 1940
CAM LOS NUÑEZ over STREAM
Built 1990
PR 181 over INFIERNO CREEK
Built 1925
OFF PR 852 KM 14.2 over UNNAMED CREEK
Built 2003
OFF PR 825 4.2 KM over UNKNOWN CREEK
Built 2003
PR 852 0.05 KM over DOS BOCAS CREEK
Built 1980
PR-52 over CAMINO LOS GUAYABOS
Built 2020
PR 176 10.5 KM over NEGRITA CREEK
Built 1940
PR 176 10.4 KM over CHORROS CREEK
Built 1940
Bridge Details
- Structure #
- 010411
- Year Built
- 1965
- Length
- 6.2 m (20.3 ft)
- Max Span
- 3 m
- Width
- 11.8 m (38.7 ft)
- Lanes
- 1
- Daily Traffic
- 2,100
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $104,000
- Total Project Cost
- $156,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.