PR-52 over CAMINO LOS GUAYABOS
PR-52 KM 8.7 · County 127, Puerto Rico · Built 2020 · 2 Lanes · 52,700 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
18.318844, -66.035397
This bridge is in worse condition than 8.5% of bridges in County 127. The average bridge in Puerto Rico is 0 years old; this one is 6 years old.
Nearby Bridges
PR 176 10.5 KM over NEGRITA CREEK
Built 1940
PR 176 10.4 KM over CHORROS CREEK
Built 1940
PR 176 11.05 KM over CARRAIZO CREEK
Built 1940
PR 176 10 KM over DEPRESSION
Built 1940
PR 175 over CARRAIZO CREEK
Built 1953
PR-52 over CAMINO MARCELO
Built 2020
PR 52 NOBD 8.7 KM over LOCAL ROAD
Built 1977
PR 52 SOBD 8.7 KM over LOCAL ROAD
Built 1977
PR-52 over PR-175
Built 2020
PR 52 SOBD 10.9 KM over PR 175 1.5 KM
Built 1977
Bridge Details
- Structure #
- 031031
- Year Built
- 2020
- Length
- 32 m (105 ft)
- Max Span
- 30.8 m
- Width
- 10.5 m (34.4 ft)
- Lanes
- 2
- Daily Traffic
- 52,700
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.