PR 52 SOBD 8.7 KM over LOCAL ROAD

11.5 KM SW OF RIO PIEDRAS · County 127, Puerto Rico · Built 1977 · 3 Lanes · 52,700 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
012732
Year Built
1977
Length
31.2 m (102.4 ft)
Max Span
30 m
Width
18 m (59.1 ft)
Lanes
3
Daily Traffic
52,700
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$167,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.