PR-52 over CAM PEDRO VIERRA
PR-52 KM 6.4 · County 127, Puerto Rico · Built 2020 · 2 Lanes · 52,700 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
18.328111, -66.053761
This bridge is in worse condition than 10% of bridges in County 127. The average bridge in Puerto Rico is 0 years old; this one is 6 years old.
Nearby Bridges
PR 52 SOBD 8.7 KM over LOCAL ROAD
Built 1977
PR 52 NOBD 8.7 KM over LOCAL ROAD
Built 1977
PR-52 over CAMINO MARCELO
Built 2020
CAMINO DE JESUS over _
Built 2018
PR 52 NRTBD 5.0 KM over LUCIANO VAZQZ ST 1.7 KM
Built 1977
PR 52 NOBD 7.3 KM over LOCAL ROAD
Built 1977
PR 52 SBD 5.0 KM over LUCIANO VZQZ RD 5.0 KM
Built 1977
PR 52 SOBD 7.3 KM over LOCAL ROAD
Built 1977
PR-52 over CAMINO LUCIANO VAZQUEZ
Built 2020
PR 176 10 KM over DEPRESSION
Built 1940
Bridge Details
- Structure #
- 031011
- Year Built
- 2020
- Length
- 32.6 m (107 ft)
- Max Span
- 30.8 m
- Width
- 10.6 m (34.8 ft)
- Lanes
- 2
- Daily Traffic
- 52,700
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.