OFF PR 825 4.2 KM over UNKNOWN CREEK
8 Km SE Trujillo Alto · County 139, Puerto Rico · Built 2003 · 1 Lanes · 2,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
18.311772, -65.968261
This bridge is in worse condition than 50% of bridges in County 139. The average bridge in Puerto Rico is 0 years old; this one is 23 years old.
Nearby Bridges
OFF PR 852 KM 14.2 over UNNAMED CREEK
Built 2003
OFF PR 852 over UNKNOWN CREEK
Built 2003
CAM LOS NUÑEZ over STREAM
Built 1990
PR 853 5.1 KM over PASTRANA CREEK
Built 1940
PR 853 9.15 KM over MARACUTO CREEK
Built 1950
KM 0.2 over UNMARKED CREEK
Built 2010
PR 851 4.1 KM over INFIERNO CREEK
Built 1965
PR 181 over INFIERNO CREEK
Built 1925
PR 852 0.05 KM over DOS BOCAS CREEK
Built 1980
PR 175 12 KM over CREEK
Built 1950
Bridge Details
- Structure #
- 026911
- Year Built
- 2003
- Length
- 25.8 m (84.6 ft)
- Max Span
- 13.1 m
- Width
- 13 m (42.7 ft)
- Lanes
- 1
- Daily Traffic
- 2,000
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $24,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.