PR 852 0.05 KM over DOS BOCAS CREEK
4 KM S E OF TRUJILLO ALTO · County 139, Puerto Rico · Built 1980 · 2 Lanes · 10,400 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
18.341514, -65.991189
This bridge is in worse condition than 50% of bridges in County 139. The average bridge in Puerto Rico is 0 years old; this one is 46 years old.
Nearby Bridges
PR 181 over INFIERNO CREEK
Built 1925
PR 175 12 KM over CREEK
Built 1950
CONN. PR181 TO 175 over RIO GRANDE DE LOIZA
Built 2007
PR 181 62.0 KM over GRANDE DE LOIZA RIVER
Built 1985
PR 8860 over CREEK
Built 1993
CAM LOS NUÑEZ over STREAM
Built 1990
PR 851 4.1 KM over INFIERNO CREEK
Built 1965
PR-66 KM 2.40 over PR-887 KM 2.0
Built 2007
PR 175 over CARRAIZO CREEK
Built 1953
PR 66 3.8 KM over GRANDE DE LOIZA RIVER
Built 2007
Bridge Details
- Structure #
- 017241
- Year Built
- 1980
- Length
- 30.6 m (100.4 ft)
- Max Span
- 28 m
- Width
- 14.3 m (46.9 ft)
- Lanes
- 2
- Daily Traffic
- 10,400
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $197,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.