PR 8860 over CREEK
6 KM S W OF CAROLINA · County 139, Puerto Rico · Built 1993 · 4 Lanes · 25,900 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
18.360042, -65.999842
This bridge is in worse condition than 25% of bridges in County 139. The average bridge in Puerto Rico is 0 years old; this one is 33 years old.
Nearby Bridges
PR 181 62.0 KM over GRANDE DE LOIZA RIVER
Built 1985
CONN. PR181 TO 175 over RIO GRANDE DE LOIZA
Built 2007
PR 175 12 KM over CREEK
Built 1950
PR 852 0.05 KM over DOS BOCAS CREEK
Built 1980
PR 181 over INFIERNO CREEK
Built 1925
URUGUAY ST 0.15 KM over BLASINA CREEK
Built 1985
PR-66 KM 2.40 over PR-887 KM 2.0
Built 2007
PR 66 over PR 887
Built 2008
PR-66 over Blasina Creek
Built 2007
PR 66 3.8 KM over GRANDE DE LOIZA RIVER
Built 2007
Bridge Details
- Structure #
- 023251
- Year Built
- 1993
- Length
- 11 m (36.1 ft)
- Max Span
- 5.1 m
- Width
- 20.5 m (67.3 ft)
- Lanes
- 4
- Daily Traffic
- 25,900
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $23,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.