PR 743 over LA PLATA RIVER

3 MILES N E OF CAYEY · County 035, Puerto Rico · Built 1951 · 2 Lanes · 4,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
006221
Year Built
1951
Length
36.6 m (120.1 ft)
Max Span
11 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
4,000
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$395,000
Total Project Cost
$473,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.