PR 52 SOUTHBOUND over GUAVATE RIVER

5.3 KM NORTHEAST OF CAYEY · County 035, Puerto Rico · Built 1972 · 2 Lanes · 32,850 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
020182
Year Built
1972
Length
51.6 m (169.3 ft)
Max Span
16.1 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
32,850
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$1,439,000
Total Project Cost
$1,799,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.