RAMP FROM PR 20 NB over PR 21 KM 1.8 KM 4.8

2.3 KM NORTH OF GUAYNABO · County 127, Puerto Rico · Built 1997 · 2 Lanes · 40,400 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
023761
Year Built
1997
Length
28.6 m (93.8 ft)
Max Span
26.5 m
Width
12.7 m (41.7 ft)
Lanes
2
Daily Traffic
40,400
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.