PR 52 SOUTHBOUND over PR 738

3.8 KM NORTHEAST OF CAYEY · County 035, Puerto Rico · Built 1971 · 2 Lanes · 65,700 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
020242
Year Built
1971
Length
30.1 m (98.8 ft)
Max Span
28.6 m
Width
14.1 m (46.3 ft)
Lanes
2
Daily Traffic
65,700
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$594,000
Total Project Cost
$743,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.