VISITOR & PROJECT over BONNEVILLE DAM

NEW LOCK SWING BRIDGE · County 051, Oregon · Built 1992 · 2 Lanes · 1,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
CEPNPPOR000BD12
Year Built
1992
Length
102.9 m (337.6 ft)
Max Span
56.9 m
Width
9.6 m (31.5 ft)
Lanes
2
Daily Traffic
1,000
Material
Prestressed Concrete Continuous
Design
Movable - Swing
Owner
Corps of Engineers (Civil)
Last Inspected
N/A
Est. Improvement
$266,000
Total Project Cost
$399,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.