ACCESS- BRADFD IS over BONNEVILLE DAM

A-BRANCH FISHLADDER BRIDG · County 051, Oregon · Built 1938 · 2 Lanes · 83 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
CEPNPPOR000BD03
Year Built
1938
Length
45.6 m (149.6 ft)
Max Span
21.3 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
83
Material
Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
Corps of Engineers (Civil)
Last Inspected
N/A
Est. Improvement
$20,000
Total Project Cost
$30,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.