002CS over EAGLE CREEK

AT CASCADE HATCHERY · County 051, Oregon · Built 1914 · 1 Lanes · 85 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
02063A002C04157
Year Built
1914
Length
31.4 m (103 ft)
Max Span
18.4 m
Width
7.9 m (25.9 ft)
Lanes
1
Daily Traffic
85
Material
Concrete
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$362,000
Total Project Cost
$580,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.