PROJECT ACCESS over BONNEVILLE DAM

TANNER CREEK SPUR BRIDGE · County 051, Oregon · Built 1907 · 1 Lanes · 20 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
CEPNPPOR000BD04
Year Built
1907
Length
30.5 m (100.1 ft)
Max Span
29.9 m
Width
5 m (16.4 ft)
Lanes
1
Daily Traffic
20
Material
Steel
Design
Girder and Floorbeam System
Owner
Corps of Engineers (Civil)
Last Inspected
N/A
Est. Improvement
$108,000
Total Project Cost
$162,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.