JETTERS WAY over MAIN STAYTON CANAL
02 S OF IDA STREET · County 047, Oregon · Built 1975 · 1 Lanes · 56 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 8 | Very Good |
Location
44.793939, -122.814681
This bridge is in worse condition than 25.9% of bridges in County 047. The average bridge in Oregon is 0 years old; this one is 51 years old.
Nearby Bridges
WILCO ROAD over SALEM DITCH
Built 1968
W WASH ST over SALEM DITCH
Built 1975
N. HOLLY AVE over MAIN STAYTON CANAL
Built 1970
S. 1ST AVE over MAIN STAYTON CANAL
Built 1965
COUNTY RD 601 over NORTH SANTIAM RIVER
Built 1965
N. FIRST AVE over SALEM DITCH
Built 1968
STAYTON-SCIO RD over N SANTIAM R OVERFLOW
Built 1964
N. SECOND AVE over SALEM DITCH
Built 1965
EAST WATER ST over MAIN STAYTON CANAL
Built 1973
N.THIRD AVE over SALEM DITCH
Built 1970
Bridge Details
- Structure #
- 47B010000000000
- Year Built
- 1975
- Length
- 12 m (39.4 ft)
- Max Span
- 11.6 m
- Width
- 3.7 m (12.1 ft)
- Lanes
- 1
- Daily Traffic
- 56
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $125,000
- Total Project Cost
- $200,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.